Preliminary Plat - Swalheim Business Park
Town of Cottage Grove
Staff recommends conditional approval
Attachments:
A motion was made by BOLLIG, seconded by KRONING, that the Land Division
be approved with conditions. The motion carried by the following vote: 5-0.
1. Rezone Petition #11960 is to become effective and all conditions are to be
satisfied prior to the recording of the CSM. (County Board approved the Petition
on August 17, 2023)
• Recording of an approved plat
• The rezone will not become effective until a final plat and developer’s
agreement are approved and fully executed by the Town of Cottage Grove.
• A deed restriction shall be recorded on the lot stating the following:
• a. Land uses on the property shall be limited exclusively to the following
permitted uses: i. Agricultural uses (livestock not permitted) ii. Agricultural
accessory uses (livestock not permitted) iii. Contractor, landscaping or building
trade operations iv. Governmental, institutional, religious, or nonprofit
community uses v. Indoor sales vi. Indoor storage and repair vii. Light industrial
viii. Office uses ix. Personal or professional service x. A transportation, utility,
communication, or other use that is: 1. Required under state or federal law to be
located in a specific place, or; 2. Is authorized to be located in a specific place
under a state or federal law that specifically preempts the requirement of a
conditional use permit. xi. Undeveloped natural resource and open space areas
xii. Utility services associated with, and accessory to, a permitted or conditional
use xiii. Veterinary clinics b. Land uses on the property shall be limited
exclusively to the following conditional uses: i. Communication towers ii.
Outdoor Storage iii. Transportation, communications, pipeline, electric
transmission, utility, or drainage uses, not listed as a permitted use above iv.
Vehicle repair or maintenance service c. Residential and associated accessory
uses are prohibited.
2. All public land dedications are to be clearly designated Dedicated to the
Public.
3. Utility easements are to be provided.
• Easements across lots or along rear or side lot lines shall be provided for
utilities where necessary, shall be at least 6 feet wide on each side of lot lines
4. All street names shall be consistent with chapter 76 of the Dane County
Ordinances.
• Dane County Surveyor: Pondella Lane is an acceptable road name.
5. Comments from the Public Health department are to be recognized:
• We are fine with this. Looks like all lots have a POWTS area delineated and we
have the soil tests for those sites ~ John Hausbeck