PETITION: CUP 02603
APPLICANT: R AND R LIVING TR (RAMI ABUROMIA)
LOCATION: 1993 STATE HIGHWAY 92, SECTION 29, TOWN OF
SPRINGDALE
CUP DESCRIPTION: tourist or transient lodging, and limited farm business
A motion was made by BOLLIG, seconded by RATCLIFF, that the Conditional Use
Permit be approved based on the findings of fact as noted in the staff report and
it has been determined that the CUP meets the standards for obtaining a CUP
with the conditions as noted in the staff report. The motion carried by the
following vote: 5-0.
1. The physical development and operation of the conditional use must conform,
in all respects, to the approved site plan, operation plan and phasing plan.
2. New and existing buildings proposed to house a conditional use must be
constructed and maintained to meet current requirements of applicable sections
of Wisconsin Commercial Building Code or Uniform Dwelling Code.
3. The applicant shall apply for, receive and maintain all other legally required
and applicable local, county, state and federal permits. Copies of approved
permits or other evidence of compliance will be provided to the county zoning
administrator upon request.
4. Any ongoing business operation must obtain and continue to meet all legally
required and applicable local, county, state and federal licensing requirements.
Copies of approved licenses or other evidence of compliance with be provided to
the county zoning administrator upon request.
5. Existing onsite wastewater sewage disposal systems, if any, serving the
conditional use must be inspected by a licensed plumber to determine its
suitability for the proposed or expanded use. Deficient systems must be brought,
at the owner’s expense, into full compliance with the current requirements for
new development of the state plumbing code and Chapter 46 Dane County Code.
6. All vehicles and equipment must access the site only at approved locations
identified in the site plan and operations plan.
7. Off-street parking and circulation must be provided, consistent with s. 10.102(8)
of County Ordinances.
8. If Dane County Highway Transportation and Public Works Department or the
town engineer determine that road intersection improvements are necessary to
safely accommodate the conditional use, the cost of such improvements shall be
borne by the landowner. Costs borne by the landowner shall be proportional to
the incremental increase in traffic associated with the proposed conditional use.
9. The County Zoning Administrator or designee may enter the premises of
operation in order to inspect those premises and to ascertain compliance with
these conditions or investigate an alleged violation. Zoning staff conducting
inspections or investigations will comply with any applicable workplace safety
rules or standards for the site.
10. The owner must post, in a prominent public place and in a form approved by
the county zoning administrator, a placard with the approval of the Conditional
Use Permit number, the nature of the operation, name and contact information
for the operator, and contact information for the Dane County Zoning Division.
11. The owner or operator must keep a copy of the conditional use permit,
including the list of all conditions, on the site, available for inspection to the