CONTRACT CHANGE ORDER #13 TO CONTRACT FOR MEAD & HUNT,
INC. FOR JAIL CONSOLIDATION-A/E DESIGN AT THE PUBLIC SAFETY
BUILDING
RIPP, McCARVILLE, ENGELBERGER, VELDRAN and ANDRAE
Sponsors:
A motion was made that the Resolution be adopted. The motion carried by the
following vote:
24 -
Ayes:
Noes:
ANDRAE, BOLLIG, COLLINS, DOOLAN, DOWNING, EICHER, ENGELBERGER,
ERICKSON, GLAZER, HATCHER, HYNES, JOERS, KIEFER, McCARVILLE,
MCGINNITY, MILES, PALM, RIPP, RATCLIFF, ROSE, SCHAUER, VELDRAN,
WEIGAND and XISTRIS-SONGPANYA
13 -
BARE, CASTILLO, CHAWLA, DOYLE, GRAY, HUELSEMANN, KIGEYA,
PELLEBON, RITT, SMITH, WEGLEITNER, WRIGHT and YANG
INITIAL RESOLUTION AUTHORIZING GENERAL OBLIGATION BONDS IN AN
AMOUNT NOT TO EXCEED $10,000,000
McCARVILLE, ENGELBERGER, KIEFER, VELDRAN and BOLLIG
Sponsors:
A motion was made that the Resolution be adopted. The motion required a 3/4
vote and failed by the following vote:
25 -
Ayes:
Noes:
ANDRAE, BOLLIG, COLLINS, DOOLAN, DOWNING, EICHER, ENGELBERGER,
ERICKSON, GLAZER, HATCHER, HYNES, JOERS, KIEFER, McCARVILLE,
MCGINNITY, MILES, PALM, RIPP, RATCLIFF, ROSE, SCHAUER, VELDRAN,
WEIGAND, XISTRIS-SONGPANYA and YANG
12 -
BARE, CASTILLO, CHAWLA, DOYLE, GRAY, HUELSEMANN, KIGEYA,
PELLEBON, RITT, SMITH, WEGLEITNER and WRIGHT
RESOLUTION PROVIDING FOR A REFERENDUM ELECTION ON THE
QUESTION OF THE APPROVAL OF AN INITIAL RESOLUTION AUTHORIZING
THE ISSUANCE OF GENERAL OBLIGATION BONDS IN AN AMOUNT NOT
TO EXCEED $10,000,000
McCARVILLE, KIEFER and BOLLIG
Sponsors:
A motion was made by WEGLEITNER, seconded by CHAWLA, that the Resolution
be amended: "Prior to the word cost in the referendum question insert "total
expected" and after the word cost insert "of $176,000,000" . Motion failed on a
voice vote.